How Long Does It Actually Take to Build a Website?

By Koprio Team

A laptop displaying a website on a wooden desk with potted plants

Blog

How Long Does It Actually Take to Build a Website?

By Koprio Team

A single page site can be live in a week or two. A small business site of a handful of pages usually takes three to six weeks. An online shop or anything with custom features runs longer, often six to twelve weeks or more. The build itself is rarely the slow part. Content and feedback are.

Stage by stage

Stage

What happens

Rough time

Discovery

A conversation about your business, customers and goals, then a plan and quote

A few days to a week

Content

Gathering or writing the words, collecting or taking photos

1 to 3 weeks, often the longest stage

Design

Turning the plan and content into a look and layout for you to approve

1 to 2 weeks

Build

Making the approved design into a working site

1 to 3 weeks

Review

Your feedback, revisions, testing on devices

1 to 2 weeks

Launch

Final checks, going live, connecting the domain and analytics

1 to 2 days

Stages overlap in practice, which is why the totals are shorter than adding these up.

What slows a project down

  • Content from the client. The single biggest cause of delay. If the words and photos are not ready, nothing else can finish

  • Scope creep. Adding pages and features mid project resets timelines

  • Slow feedback. A round of review that sits for two weeks adds two weeks

  • Too many decision makers. Every extra person who has to approve things adds time

  • Waiting on third parties. Domain access, logins, photographer availability

What speeds it up

  • Have your content ready, or pay for copywriting so it is handled

  • Agree the scope upfront and stick to it

  • Give feedback in one consolidated round, quickly

  • Nominate one person to approve things

  • Sort out domain and account access early

Why "quick" is not always good

A site built in 48 hours is usually a template with your logo dropped in. It will look like other sites and rarely fits how your business actually wins customers. A few weeks of proper discovery, content and design is what makes the difference between a site that sits there and one that brings in enquiries.

What Koprio's timescales look like

  • Starter, single page: one to two weeks from the initial chat, once the design is approved

  • Growth, up to six pages with copywriting: three to four weeks from the initial chat, once designs are approved

  • Ecommerce: varies with the size of the shop and the amount of product setup, quoted once we know the detail

The takeaway

Expect one to two weeks for a single page, three to six weeks for a small business site, and longer for a shop. The timeline is driven mostly by how fast content and feedback come together, not by the build. Get your content ready and respond quickly and most projects run to schedule.

Get in touch for a timeline based on what you need, or read how much a website costs.